Because it is difficult to apply AEPs for frequent events, the terminology of Exceedances per Year (EY) has been introduced. Note that 50% and 20% AEPs do not correspond directly to 2 and 5 year ARIs. Explanations are provided in the BOM site, at www.bom.gov.au/water/designRainfalls/ifd/ifd-faq.shtml#sec1q6.